Aqua Pro 69716 9.5'' Long Lead Free Packaged Magnesium Anode Rod with 3/4'' Male Pipe Thread (6)


Aqua Pro 69716 9.5'' Long Lead Free Packaged Magnesium Anode Rod with 3/4'' Male Pipe Thread (6) by Aquapro at Johnson RV Sales. MPN: 69716. Hurry! Limited time offer. Offer valid only while supplies last. Water Heater Anode Rod; For Suburban And Morflo Water Heaters; 9-1/2 Inch Length; Magnesium; With 3/4 Inch Male Pipe Thread Drain Plug; With Retail Packaging; Lead FreeCompatibility: Suburban And Morflo Water Heaters. Significantly Extends The Water Heater Tank Life. Magnesium Anode Rods Will Attract The Elements That Cause Corrosion, Protecting The Tank From Those Elements. Material: Magnesium. 18 Percent More Magnesium For Extended Protection.


Aqua Pro 69716 9.5'' Long Lead Free Packaged Magnesium Anode Rod with 3/4'' Male Pipe Thread (6) by Aquapro
4.8 out of 5 stars with 52 reviews
Condition: New
Availability: In Stock
$69.24


Quantity:  

 


Product Description & Reviews

Water Heater Anode Rod; For Suburban And Morflo Water Heaters; 9-1/2 Inch Length; Magnesium; With 3/4 Inch Male Pipe Thread Drain Plug; With Retail Packaging; Lead Free

Features & Highlights

  • Compatibility: Suburban And Morflo Water Heaters
  • Significantly Extends The Water Heater Tank Life
  • Magnesium Anode Rods Will Attract The Elements That Cause Corrosion, Protecting The Tank From Those Elements
  • Material: Magnesium
  • 18 Percent More Magnesium For Extended Protection

Additional Information

Brand:
Aquapro
Manufacturer:
Aqua Pro
Category:
Water Heaters
MPN:
69716
UPC:
689271250859
Part Number:
69716
Publisher:
Aqua Pro

 


Have questions about this item (69716), or would like to inquire about a custom or bulk order?


If you have any questions about this product by Aquapro, contact us by completing and submitting the form below. If you are looking for a specif part number, please include it with your message.

First Name:
Last Name:
Email Address:
Your Message:

Related Best Sellers


mpn: 20861, ean: 0014717208611,
The Camco 30'' ID x 2.25'' deep Aluminum Water Heater Drain Pan collects and drains off leaking water or water from an activated T and P valve. For gas or electric water heaters. Dual size 1'' to 1.5'' PVC drain fitting with gaskets included. Sides a...

mpn: SW6DE, ean: 0707565813860,
Suburban Water Heater SW6DE for RV Camper Trailer LP Gas and Electric Electric Ignition / DSI w/White Door 6 Gallon Quality you want ... now and down the road. The best water heaters on the road today, Suburban's line of water heaters includes high r...

mpn: 11432, ean: 0014717114325,
This wall mount, aluminum tankless drain pan is designed to fit underneath most whole house tankless water heaters providing both water damage protection and flushing maintenance convenience. These aluminum pans will not rust, corrode or crack and ma...

mpn: 57715, ean: 0014717577151,
Camco's Olympian Wave heater custom fitted dust cover is designed to extend the life of your Wave heater by protecting it from dust and debris that can inhibit their performance. Designed for use on Wave 8 heaters that are wall mounted.For Wave 8 Hea...